The base for the Kiln is finally completed! I built the firebox walls up to level with the second loading chamber for strength of walls. On top of this base will be the arched top of the Kiln.
Also finished is the base for the side loading door and the smoke trail and start of chimney!
Next is to build the wooden arch form to go over the entire Kiln!
No comments:
Post a Comment